
A 100 kW hybrid rooftop system with a 125 kWh battery energy storage cabinet for a city corporation building.
A 100 kW hybrid solar system with a 125 kWh battery energy storage cabinet for a Bogura City Corporation building, keeping essential municipal services running through load-shedding.
Frequent outages interrupted citizen services and the building relied on a diesel generator that was noisy and expensive to run.
We installed a hybrid system that runs the building on solar by day and charges an outdoor LFP battery cabinet. When the grid fails, critical circuits switch to the battery automatically with no break in supply.
Load study
Mapped critical circuits and outage history.
Installation
Rooftop array and battery cabinet in 4 weeks.
Commissioning
Outage simulation tests with the electrical department.
4 photos. Select one to view it full screen.
| Item | Brand | Quantity |
|---|---|---|
| Bifacial modules, 580 W | Jinko Solar | 174 |
| Hybrid inverters | Deye | 2 |
| LFP battery cabinet, 125 kWh | LVTOPSUN | 1 |
| Critical-load changeover panel | Exclusive Solutions | 1 |
Our essential services now stay on during load-shedding, and the handover training gave our staff confidence to run the system.

Share your site and monthly bill. We will send references from similar projects and book a free survey.